The project includes the widening of the existing roadway, adding lanes including bike lanes, sidewalk, also including patching, drainage, guiderail, replacement of existing signals, replacement of an existing culvert with a Precast Concrete Box Culvert, waterline relocation, sanitary sewer relocation and other miscellaneous construction.